Sign In | Join Free | My lightneasy.org
lightneasy.org
Products
Search by Category
Home > Plasterboards >

Environmental Prebuilt Modular Steel Garage Buildings Home With Kitchen , Toilets

Categories Light Steel Structure House
Place of Origin: CHINA
Brand Name: LD
Certification: CE,ISO
Model Number: LD
MOQ: 1 set
Price: Negotiation
Packaging Details: Wooden packing or negotiation
Delivery Time: 30 work days
Payment Terms: T/T, L/C
Supply Ability: designed
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Environmental Prebuilt Modular Steel Garage Buildings Home With Kitchen , Toilets

    Environmental Prebuilt Modular Steel Garage Buildings Home With Kitchen , Toilets


    Specification


    Structure

    (I)Primary structure
    Light steel keelWall system: 140/89mm; Roof system: 70mm(Q550 Galvanized)

    Light gauge steel channel

    (II)MAINTENANCE
    EXTERNAL WALL27mmPU EMBOSSED STEEL PANEL+HOUSE WRAP+12mmOSB BOARD+150mm INSULATION GLASS WOOL+12mm WATERPROOF GYPSUM BOARD
    INTERNAL WALL12mm WATERPROOF GYPSUM BOARD+150mm INSULATION GLASS WOOL
    FALSE CEILING0.5mm COLOR STEEL SHEET
    9mm GYPSM BOARD
    FLOOR SUPPORTING BOARD1mm GALVANIZED MODELED FLOOR SUPPORTING BOARD
    GALVANIZE
    FLASHING EDGING0.5mm SELF FOLDING COLOR STEEL SHEET
    DOOR1200*200mm STEEL DOOR
    960*2050mm STEEL DOOR
    800*210mm PVC MODELED DOOR
    700*210mm PVC MODELED DOOR

    Sample of the wall system

    (III)FITTINGS
    HARDWARE
    RAINWATER SYSTEM75*50mmPVC RECTANGULAR TUBLE
    PVC EAVES GUTTER(WITH ACCESSORIES)
    ELECTRICITYLIGHTS, SWITCHES, SOCKETS, DISTRIBUTION BOX

    Competitive Advantage

    1. easy to install ---- all the fixed holes and pipe holes are prepunched,2-3 workers can finish the installation.(save 70% labor cost, shorten 10% construction period, fasten 30% the construction process)

    2. Fire and insect resistance ----- All the keels are galvanized, no need to use pesticide, preservative or glue. The wall system is filled with anti-fire glass wool and the steel itself is anti-fire.

    3. Prefabricated ------ our factory will first manufacture all the keels and then prefabricate the walls and last pack them.

    4. Heat insulation ------ the steel wall system is not affected by the temperature or humidity so that the more heat and air conditioner utility kept in the house, the more energy will be saved.

    5. Wind &seismic resistance ----- the firm connection and the hardness of the steel itself can against the seismic and hurricane to a large extend.

    Steel’s high tenacity make it the best building material to resist the seismic.

    1. Artistic and comfortable ----- the inner decoration is as per your wish. And the air quality is good.

    7. Energy conservation and environment protection ------ only 1% construction wastes. The recycling rate of the steel reaches 70%. What’s more, until the house life is over, the steel can still be used.


    Checking and Packaging

    Packing: one independent project (such as wall, truss, decking, chassis) packed in a small package, every community packed in a big package.

    Encasement: 20 or 40 chi shipping container.


    Application

    Carport, Hotel, House, Kiosk, Booth, Office, Sentry Box, Guard House, Shop, Toilet, Villa, Warehouse, Workshop, Plant, kitchen, corridor.


    Comfortable Light Seel Frame Construction Modular Homes Prefab Construction Villa


    Comfortable Light Seel Frame Construction Modular Homes Prefab Construction Villa


    Galvanized steel keel with construction board is the main loading-bearing system. Such building system possesses a more stable wholeness and light dead load that make it possible to prevent earthquake of 9 magnitude and hurricane in speed of 50m/s. High-rise building is also available to build with light steel.
    B. Industrializing Production
    The quatity of light gauge steel frame used in leader house projects can be calculated by CAD drawing and the production is strictly controlled by computer. The accuracy of the size can reach to the level of millimter which makes it easier to construct.
    C. Quick Installation
    The construction of light gauge steel house completely achieve the factory prefabrication and on-site assemblage. The whole building process is under dry construction which is ecofriendly and convenient. The quick installation helps recovery money rapidly of all the light gauge steel real estate projects.
    D. Flexible Space Division & More Space Utilization
    The span of light gauge steel can reach to 6-15 meters which makes the customers devide space more freely. Due to the wall of light gauge steel house is twice thicker than ordinary brick-concrete house, the percentage of usable area can reach to 92% which is 7%-10% larger than ordinary construction. So, light gauge steel is widely used in apartement buildings, church and hotels, ect.
    E: Energy-saving & Eco-friendly
    The wall system of light gauge steel belongs to compound wall system. The performance of insulation and soundproof is much better than concrete house. The percentage of energy saving is around 60%-70% compared with concrete house. All the light steel struction and 80% other materials can be recycled that can meet with the requirement of eco-friendly. Therefore, light steel building system is also suitable for school, hospital and shops.
    FAQ:
    Q: How to buy?
    A: You can provide us your drawing, and we will produce as your drawings.
    Q: How to pay?
    A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
    Q: What is the delivery time?
    A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
    Q: How to ship?
    A: Loading by sea shipping container.
    Q: How to install after the goods arriving destination?
    A: We will provide detailed illustration photos and videos to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be borne by buyers.

    If have any problems, pls contact me freely


    Light Steel Structure House manufacturer in China


    Quality Environmental Prebuilt Modular Steel Garage Buildings Home With Kitchen , Toilets for sale
    Send your message to this supplier
     
    From:
    To: Leader Machinery Manufacture Co.,Ltd.
    Subject:
    Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0