Sign In | Join Free | My lightneasy.org
lightneasy.org
Products
Search by Category
Home >

Multi Purpose 200m Railroad Crawler Mounted Drill Rig

Categories Crawler Mounted Drill Rig
Type: portable water well drilling rigs
Drilling depth: 200m
Feature: High Drilling Efficiency
Usage: Water Well
Application: Soil Sampling
Drilling angle:: 90°~65°
Model Number: GK200
Place of Origin: China
MOQ: Negotiation
Price: Negotiation
Delivery Time: Within 7-12 days
Payment Terms: L/C, D/A, T/T, Western Union
Brand Name: ShiTan
Certification: ISO9001
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Multi Purpose 200m Railroad Crawler Mounted Drill Rig

Multi Purpose 200m Depth Railroad Construction Crawler Mounted Drill Rig


Brief Introduction


GK200 drilling rig is mainly a collection of functions and features of the popular market XY-1, XY-1B, XY-1A other small rigs.It is a light larger torque rotary rigs which uses XY-1 hydraulic automatic infeed, a wide range of large modulus gear transmission of XY-1B's, XY-1A Wide range speed. Suitable for geological survey and prospecting, exploration roads and building exploration , high-speed grouting detection hole, blast hole, small wells, small pile hole drilling, etc.


Specifications


(1) Rated drilling depth:200m,The deepest shall not exceed 220m.

Rated opening diameter:200mm.

Maximum opening diameter : 300mm.

Drilling depth and drilling diameter shall be determined according to the formation conditions.
(2)The vertical speed (four steps):118,236,505,1010.r/rain
(3)Max output torque:1500N. m
(4)Maximum weight (a speed of single rope):17KN
(5)drill pipe diameter:42mm
(6)Borehole inclination:90~75°
(7)Rig overall dimensions·(L×B×H)1433×697×1273mm
(8)Rig weight:500kg(Transfer machines 620kg, transfer machine with pump 720kg)


Application


  • Geological exploration
  • water and electricity engineering
  • road and railroad construction,
  • build engineering and big diameter water well construction project etc.

Matters Needing Attention in Drilling Process Of Crawler Drilling Rig


  • 1. After drilling structure of crawler drill bit, the center drilling tool needs to be replaced in time. Firstly, the hole bottom needs to be cleaned, and then the residue at the bottom of the hole is blown clean. After the bit stops rotating, the drilling tool in the drilling rig is slowly lifted up. When the lifting force is good enough to lift the drilling tool, it is appropriate.
  • 2. When the drill bit of crawler drilling rig is summarized in the drilling process, it is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and timely keep the hole clean when necessary, and the drill bit in the drilling rig is not allowed to pull out forcefully during the drilling process.
  • 3. Sometimes more residual rock slag will be left at the bottom of the hole of crawler drilling rig, and the rotary part of the eccentric bit will be blocked by the rock slag, which will affect its closing production. At this time, it is necessary to transport compressed air, clean the hole again, and make the DTH hammer work for a short time, and then lift the central drilling tool again.

Jinzhou Shitan Machinery Equipment Co., Ltd. Main Products:

Pneumatic Drilling Rig / Air Drilling Rig(ST-180, ST-200, ST-260, ST-300, ST-350, ST-400, ST450, ST-450, ST-500, ST-600, ST-800 and other Pneumatic water well drilling Rigs.), Crawler Water Well Drilling Rig / Trailer Mounted Drilling Rig / Water Well Drilling Rig / Hydraulic Borewell Machine / Hard Rock Drilling Equipment / Diamond Core Drill Rig / Geological Drilling Rig / Soil Testing Drilling Rig / Portable Water Well Drilling Rig(ST-30,ST-50,XY-1A, XY-1B, XY-2, XY-2B, GK180, GK200, GY150, GY200 and 30 impact drill rig, ZLJ series tunnel drilling rig and other geological drilling machines)Crawler Track Undercarriage, Drilling Mud Pump(BW150,BW160,BW200,BW250,BW850 series Drilling mud pumps), Drilling Air Compressor, Water Well Drill Bits(PDC Drill Bit, Tricone Bit, DTH Button Bit), Water Well Drill Pipe, Drilling Rig Spare Parts( drilling rods , drilling rods joint , casing pipe, casing coupling, core tube, core tube coupling, lifters, automatic drop hammer, sampler, SPT tool, wrench fork, pad fork, lock joint), Track Transporter

OEM / ODM can accept. Good quality, professional after-sales service, welcome to order


Quality Multi Purpose 200m Railroad Crawler Mounted Drill Rig for sale
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0