Sign In | Join Free | My lightneasy.org |
|
Categories | Office Filing Cabinet |
---|---|
Place of Origin: | Henan, China |
Brand Name: | Sodorsteelart |
Model Number: | ZX-TSWJ-004 |
Certification: | GS, pcoc |
Packaging Details: | 1.KD structure, polyfoam between every part, packed in order and reasonable, not easy to shake. 2.Outside with five layers strong carton, tape sealing and packing belt to reinforce. 3.Can print LOGO or shipping mark as the customer want. 4.Each product has |
Supply Ability: | 20000 Piece/Pieces per Month |
MOQ: | Negotiate |
Price: | Negotiate |
Feature: | Extendable |
Specific Use: | Filing Cabinet |
General Use: | Commercial Furniture |
Type: | Office Furniture |
Mail packing: | Y |
Application: | School, Office School |
Design Style: | Modern |
Material: | metal |
Thickness: | 0.5-1.2mm |
Usage: | School |
Color: | Customized |
Product name: | Steel Office Furninture |
Structure: | Knock-down |
Name: | Steel Filing Cabint |
Lock: | Cam Lock |
Surface: | Environmental Protection Powder Coating |
Port: | FBA QingDao |
Chromaticity Printing Office Filing Cabinets 2 Doors Steel Metal Cabinet
Application
Home Furniture , Office Furniture , Commercial Furniture, Hospital Furniture,Other Commercial Furniture
Spcs.
Product Type | Filing Cabinet |
Item NO. | ZX-TSWG-002 |
Material | Iron,Cold Rolled Steel |
Thickness | 0.4-1.2mm optional |
Structure | Disassemble |
Available Color | Customized color |
Size | W900* D400* H1850* |
Standard | IS09001. ISO14001.BV |
Remark | OEM &ODM are available |
Delivery port | QingDao |
Packing volume | CBM |
Delivery Time | With 15 days after we received the deposit. |
Payment | 30%T/T as deposit upon receipt of proforma invoice,balance 70% against copay of B/L. |
Production Process
Cutting: According to the design-drawings, the steel sheets(open
and flat) are cut into the different sizes by the high-accuracy
machines, without error and burrs
Pressing: The CNC machine tools and other machine tools work with
the big-scale moulds together to realize the standard and flowline
production, which assure the production efficiency and quality
Bending: Skilled manpower and advanced facilities make sure the
clear lines and perfect appearance
Welding: Locate the work pieces into the fixed mould, firmly weld
with CO2 shielded welding or argon-arc welding and then conduct
slag removing and polishing.
Coating: All the sheet material parts will go through 13 treatments
of water cleaning, acid-washing, phosphating etc. The importing
automatic spray facilities and top-quality powder promise the
coating to be flat and smooth, non-toxic and smell
Installation: To ensure the firmness of every screw, the
installation work shop adopts pneumatic tools to conduct mass and
flowline production
Packing: Strict and special testing before packing and storage to
make sure the percentage of the pass.
![]() |